{"id":22999,"date":"2025-04-21T12:46:32","date_gmt":"2025-04-21T12:46:32","guid":{"rendered":"https:\/\/dogewisperer.com\/?p=22999"},"modified":"2025-04-21T12:46:32","modified_gmt":"2025-04-21T12:46:32","slug":"hive-digital-energizes-paraguay-site-with-major-bitcoin-mining-expansion","status":"publish","type":"post","link":"https:\/\/dogewisperer.com\/?p=22999","title":{"rendered":"HIVE Digital Energizes Paraguay Site With Major Bitcoin Mining Expansion"},"content":{"rendered":"<div>\n<p>On Monday,<strong> HIVE Digital Technologies Ltd <\/strong>(NASDAQ:<a class=\"ticker\" href=\"https:\/\/www.benzinga.com\/stock\/HIVE#NASDAQ\">HIVE<\/a>) disclosed that it completed Phase 1 of infrastructure development at its <a target=\"_blank\" href=\"https:\/\/www.benzinga.com\/pressreleases\/25\/04\/44891819\/hive-digital-technologies-announces-100-completion-of-first-100-mw-infrastructure-in-paraguay-and-s\" rel=\"noreferrer noopener\">flagship Yguaz\u00f9 facility in Paraguay<\/a>.<\/p>\n<p>This phase includes a 100-megawatt air-cooled data center supported by a fully operational 200-megawatt substation.<\/p>\n<p>Additionally, the company has appointed Carlos Anibal Torres as its new Operations &amp; Project Manager for Paraguay, a strategic leadership addition as HIVE ramps up growth efforts in the region.<\/p>\n<p>HIVE has finalized the construction and energization of the 100 MW Phase 1 infrastructure at its Yguaz\u00f9 facility, enabling support for up to 5 exahashes per second (EH\/s) of next-gen ASIC mining capacity.<\/p>\n<p>Currently, the company is running 200 petahashes of hashrate &#8230;<\/p>\n<p><a href=\"https:\/\/www.benzinga.com\/25\/04\/44895610\/hive-powers-up-new-100mw-facility-sets-stage-for-25-ehs-bitcoin-blitz\" alt=\"HIVE\" digital energizes paraguay site with major bitcoin mining expansion>Full story available on Benzinga.com<\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>On Monday, HIVE Digital Technologies Ltd (NASDAQ:HIVE) disclosed that it completed Phase 1 of infrastructure development at its flagship Yguaz\u00f9 facility in Paraguay. This phase includes a 100-megawatt air-cooled data center supported by a fully operational 200-megawatt substation. Additionally, the company has appointed Carlos Anibal Torres as its new Operations &amp; Project Manager for Paraguay, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"iawp_total_views":0,"footnotes":""},"categories":[2],"tags":[3,4,5],"class_list":["post-22999","post","type-post","status-publish","format-standard","hentry","category-news","tag-crypto","tag-doge","tag-news"],"_links":{"self":[{"href":"https:\/\/dogewisperer.com\/index.php?rest_route=\/wp\/v2\/posts\/22999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dogewisperer.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dogewisperer.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dogewisperer.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dogewisperer.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=22999"}],"version-history":[{"count":0,"href":"https:\/\/dogewisperer.com\/index.php?rest_route=\/wp\/v2\/posts\/22999\/revisions"}],"wp:attachment":[{"href":"https:\/\/dogewisperer.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=22999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dogewisperer.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=22999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dogewisperer.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=22999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}